TECHNICAL SERVICE DEPARTMENT
Technical Service Bulletin
1-800-432-8373
Concentric Vent Termination Kit - Installation Instructions
Technical Competence, Product Confidence
Page 3 of 7
1714.doc
d. Termination kit positioned where the vent vapors will not be objectionable.
3. Cut one hole (5” diameter) for SP12161 kit.
4. Partially assemble concentric vent termination kit. Clean and cement using procedures
found in the Advantage Plus Installation Service manual.
5. Cement the Y concentric fitting to the larger diameter kit pipe. (See Fig. 1)
6. Cement the rain cap to the smaller diameter kit pipe. (See Fig. 1)
7. Install Y concentric fitting and pipe assembly through the structure’s hole.
8. Install rain cap and small diameter pipe assembly in Y concentric fitting and large pipe
assembly. Ensure small diameter pipe is bottomed and cemented in Y concentric fitting.
9. Secure assembly to structure as shown in Fig. 7, using field supplied metal strapping or
equivalent support material.
10. Cement Advantage Plus combustion air and vent pipes to concentric vent termination
assembly. See Fig. 7 for proper pipe attachment.
11. Operate Advantage Plus one heat cycle to ensure combustion air and vent pipes are
properly connected to concentric vent termination connections.
Figure 3
Installation Instructions
Procedure 2 - Side Wall Termination (See Figure 4)
1. Determine best exterior side wall location for termination kit.
2. NOTE: Consider the following when determining an appropriate location for the
termination kit: